Wednesday, February 3, 2016

Backporch step/bridge

A step was needed from the new gate to cross over water runoff.

Laying the foundation to determine width of bridge/step.


Stabilizing and leveling out the foundation.

Measuring and cutting cross-boards.
Add caption
Screw down with 1/4 inch gap between boards for drainage.
 
 
 
 
 
 
 
 
 






Add caption

No comments:

Post a Comment