| A step was needed from the new gate to cross over water runoff. |
| Laying the foundation to determine width of bridge/step. |
| Stabilizing and leveling out the foundation. |
| Measuring and cutting cross-boards. |
| Add caption |
| Screw down with 1/4 inch gap between boards for drainage. |
| Add caption |
No comments:
Post a Comment